Assembly, formwork and concreting works, Civil engineering and Construction of one (01) basin for the lamellar settling structure

•Assembly & formwork and concreting of the floor of the calcite bed structure at the level of cap blanc

•Civil engineering construction of the Multi Media Gravity Filter (Section 05) at the level of CAP/BLANC

•Lot G: Construction of one (01) basin of the lamellar settling structure at the level of CAP/BLANC

Location

Cap Blanc, Oran

Project owner

GCB Oran

amount

127 964 272,00DZ /HT

Area

.

Duration

11 Mois

OUR CLIENTS

Slide 1
Slide 2
Slide 2
Slide 2
Slide 2
Slide 2
Slide 2
Slide 2
Slide 2
Slide 10
Slide 10
Slide 10
Slide 1
Slide 2
Slide 2
Slide 2
Slide 2
Slide 2
Slide 2
Slide 2
Slide 2
Slide 10
Slide 10
Slide 10
Slide 1
Slide 2
Slide 2
Slide 2
Slide 2
Slide 2
Slide 2
Slide 2
Slide 2
Slide 10
Slide 10
Slide 10
Slide 11
Slide 12
Slide 12
Slide 12
Slide 12
Slide 12
Slide 12
Slide 12
Slide 12
Slide 20
Slide 20
Slide 11
Slide 12
Slide 12
Slide 12
Slide 12
Slide 12
Slide 12
Slide 12
Slide 12
Slide 20
Slide 20
Slide 11
Slide 12
Slide 12
Slide 12
Slide 12
Slide 12
Slide 12
Slide 12
Slide 12
Slide 20
Slide 20

OUR PARTNERS

Slide 1
Slide 1
Slide 1
Slide 1
Slide 1